Project: Warwick Avenue

Bolt & Heeks were engaged to carry out extensive refurbishment and structural alterations to a split level 2nd/3rd floor flat together with a basement conversion to form a new apartment whilst other floors of the property were in occupation.

The project included the renewal of the slate roof, new dormer windows and structural alterations to create a new kitchen and shower room within the existing roof space.  This also required the completed design and installation of the M&E.  Finally, we installed a fire alarm system to the entire property.

Warwick Avenue

Warwick Avenue

  • Value:
  • £300K
  • Programme:
  • 30 weeks
  • Client:
  • J Harris
  • Consultant:
  • Watkinson & Cosgrave
  • Contract:
  • Minor Works 2005 including contractors design (MWD)


Construction Detail

  • Demolitions
  • Blockwork
  • New partitions
  • M&E renewals
  • Roof renewal
  • Structural alterations
  • New dormer windows
  • New Kitchen 
  • New shower room
  • Tiling
  • Decorations
  • New flooring
  • Fire alarm
  • Fabric repairs
  • External concrete repairs
  • Repairs to boundary wall
  • New bin stores