Project: Lippitts Hill Camp Air Support Unit

Lippitts Hill Camp is the base for the Metropolitan Police’s helicopter fleet.  Bolt & Heeks were engaged to upgrade the base in readiness for 2012.  The works required us to decommission and replace the existing fuel facility together with the installation of a resilience dispenser unit to provide increased capacity.

Alterations and modifications to the gauging and wet stock management systems were also undertaken together with the installation of a new enviroceptor and drainage modifications.

This was a highly technical and complex project, but the Bolt & Heeks team were able to complete the project on time and to budget.

Lippitts Hill Camp Air Support Unit

Lippitts Hill Camp Air Support Unit

  • Value:
  • £500K
  • Programme:
  • 20 weeks
  • Client:
  • Metropolitan Police Authority
  • Consultant:
  • Scott Wilson Ltd
  • Contract:
  • JCT Standard Form of Building Contract 1998 Local Authorities Without Quantities included Contractors Design Portion Supplement


Construction Detail

  • Demolition
  • Excavation
  • Mechanical installations
  • Electrical installations
  • New RC ground-bearing slab
  • Decommission existing fuel farm
  • Installation of new fuel farm
  • Upgrade wet stock management system 
  • High-security fencing